PEAK ELEVATOR LLC | Work Performed After Initial 5-yr Inspect Failure | 9/30/2023 | $6,371.00 |
DISTINCTIVE DESIGN BUILD, LLC | ARFF Bay Rehabilitation - Insulation | 6/30/2023 | $119,584.00 |
PEAK ELEVATOR LLC | Elevator Service - cleaned contacts + reset controller | 4/30/2023 | $1,565.00 |
PEAK ELEVATOR LLC | Elevator Service - F6 fuse blown / stuck in Phase 1 Fire Svc | 3/31/2023 | $2,502.50 |
D.H. PACE COMPANY, INC. | Gate 23 - deliver motor for gate and lubricate door | 3/31/2023 | $2,005.11 |
D.H. PACE COMPANY, INC. | Large Sectional Door Service - replace key, tighten, tape | 3/31/2023 | $972.00 |
D.H. PACE COMPANY, INC. | SRE Door - Reinstalled Key Stock/Reset Limits | 3/31/2023 | $660.00 |
JMRJ TOOLS & EQUIPMENT, LLC | SRE Pressure Washer 'Hotsy' Service | 2/28/2023 | $496.47 |
PEAK ELEVATOR LLC | Phone Line Hookup for Emerg Comms | 2/28/2023 | $656.25 |
D.H. PACE COMPANY, INC. | Reset Door slats back into place | 1/31/2023 | $1,320.00 |
| | Total: | $136,132.33 |